Case Studies
- Anasuria Winch Destruct Project
- An anchor chain winch on the Anasuria FPSO needed to be replaced requiring Proserv Offshore to sever the winch into several sections that could be safely removed from the turret.
- Platform Removal Project – North Sea
- Contract in March 2008 by SMIT to carry out a cutting work scope consisting of; internal sub-sea-bed pile cuts (48" x 4), internal sub-sea-bed cut on caisson (30"x1) and drilling of 12" lifting pin holes through the pile cans and piles.
- Abrasive Cutting of Mooring Piles
- During the summer of 2007, Proserv Offshore Scandinavia performed the removal of FPSO mooring piles on the Volve field in the North Sea. End client was Statoil and Subsea contractor was Deep Ocean.
- Cutting of Concrete Shafts with Diamond Wire
- During the summer of 2007, Proserv Offshore Scandinavia performed the deck separation of the platforms TCP2 and TP1 on the Frigg field in the North Sea.
- Leman Riser Cutting Project
- To safely remove a riser for Bibby Offshore to enable new modifications to take place.
Latest News
Events Calendar
March 2010 »
| M |
T |
W |
T |
F |
S |
S |
| 01 |
02 |
03 |
04 |
05 |
06 |
07 |
| 08 |
09 |
10 |
11 |
12 |
13 |
14 |
| 15 |
16 |
17 |
18 |
19 |
20 |
21 |
| 22 |
23 |
24 |
25 |
26 |
27 |
28 |
| 29 |
30 |
31 |
|
|
|
|